At St- Boniface Hospital, hope and healing means so much to so many.
 

Finding Us >
Maps

Campus Map
Main Entrance Map
Tunnel Map
Parking Map

Construction - Emergency Department

Campus Map

Includes the entrances,public elevators, and letter designation for each building that is part of the hospital. Click below to download an 8.5" x 11" PDF.

Campus Map

Listing

Main Entrance Map

Includes the Everett Atrium. Click here to download an 8.5" x 11" PDF.

Tunnel Map

Includes the underground tunnel system and campus layout. Click here to download an 8.5" x 11" PDF.

Parking Map

Includes parking for vehicle and bicycles. Click here to download an 8.5" x 11" PDF.

Construction - Emergency Department
The St. Boniface emergency department is expanding, with new triage, waiting area and mid-acuity treatment space opening in the spring of 2019. Construction will start September 4, 2018. From that date forward, only patients seeking care in Emergency and those accompanying them may access the Emergency entrance. All other visitors and patients coming for appointments should use alternate entrances and exits when arriving and leaving the hospital.

Emergency Departrment Construction

 

© 2006 - St. Boniface Hospital. All Rights Reserved.
409 Taché Avenue | Winnipeg, Manitoba | R2H 2A6 | Canada
Phone: 204-233-8563 | Email: sbghweb@sbgh.mb.ca | Read Our Conditions Of Use